Computools designed LoadSphere 3D as an optimization layer connected to the airline’s existing Cargo Management System and load-control environment. The platform supported 3D cargo load planning for two connected decisions: how to build each ULD and how to assign completed ULDs across the aircraft.
The ULD planning software evaluated shipment dimensions, gross weight, piece count, stackability, orientation restrictions, commodity type, special-handling codes, Dangerous Goods attributes, temperature-control requirements, priority status, destination, and transfer requirements.
A configuration library modeled aircraft cargo compartment geometry, available loading positions, aircraft contour profiles, supported ULD types, maximum ULD gross weight, position-specific weight limits, center-of-gravity constraints, and loading restrictions.
Computools applied advanced optimization techniques to support spatial packing, constraint-based planning, scenario generation, incremental re-optimization, and operational scoring. The optimization engine searched for feasible combinations and produced high-utilization recommendations within practical planning times.
The air cargo load planning optimization workflow lets loadmasters inspect recommendations, lock completed ULDs, lock priority shipments, move cargo manually, compare scenarios, and rerun optimization without rebuilding the full plan.
The airline cargo management system integration layer consumed flight schedules, bookings, AWBs, shipment pieces, cargo dimensions, weights, status updates, and special-handling data. Planning results were returned through controlled interfaces, while the certified load-control process remained responsible for final aircraft weight-and-balance approval.