Vexar

A healthcare hardware development for smart opioid control intake device.

case image

AT A GLANCE

Our client company, VEXAR, needed to build a working opioid control intake device based on a prototype. Computools offered a comprehensive solution with critical features such as cartridge security, small screen integration and fingerprint access. Our team proactively designed and implemented these features, ensuring regulatory compliance and improving safety and adherence.

THE CLIENT

VEXAR is a pioneering healthcare company specialising in smart, dose-controlled prescription medication systems. Their innovative approach connects the entire drug supply chain, enhancing safety, compliance, and prescription adherence. VEXAR operates in a highly regulated industry and has recently been recognised for its cutting-edge technology in healthcare solutions.

BUSINESS CHALLENGE

The client built and tested the prototype on the board, confirming its functionality. The next step was to bring the project to the DFM ( Design for Manufacturing) stage, which required rapid realisation. However, to do this, they needed to raise funding to organise clinical trials and plan the further development of the project.

SOLUTION SUMMARY

Our team built version 1.0 from an existing prototype. The features it included:

  • Ensuring the integrity of medication cartridges throughout the supply chain.
  • Incorporating a user-friendly interface for easy navigation and interaction.
  • Allowing for convenient replacement and replenishment of medication supplies.
  • Implementing biometric authentication for enhanced security and user authentication.

Additionally, Computools managed the entire development process from ideation to production readiness, including documentation.

IMPACT

VEXAR received a fully functional, reliable and safe medication intake control system. It is user-friendly for both patients and healthcare professionals.

WHY COMPUTOOLS

VEXAR considered several vendors but chose Computools due to its extensive experience in creating safe and reliable medical devices. Computools’ ISO 13485-certified risk management approach ensured that VEXAR’s system would meet all regulatory requirements. This was a decisive factor for the company.

Computools engineers worked closely with the VEXAR team to define and implement the required features.

Launch your software solution within 1-3 months instead of years. Unlock tomorrow. Build a future-ready business through innovation.

STORY IN DEPTH

Background

VEXAR was developing a new medication intake control system that had to be safe, secure, and easy to use. The system also had to be tamper-proof and protected against unauthorised access to prevent the theft or spoilage of medicines.

Approach to solution

VEXAR conducted market research and selected Computools as a partner to develop their system.

Computools role

Computools experts developed the system software using an ISO 13485-certified risk management approach.

Key decisions and outcomes

Computools proposed customised solutions to enhance device performance and user experience. By partnering with Computools, VEXAR has created a safe, reliable, user-friendly drug delivery system.

Design

Design played a crucial role in optimising the user experience and functionality of VEXAR.

WIREFRAMES → USER INTERFACE
vexar wireframes

WIREFRAMES

Creating skeletal outlines to visualise layout and functionality

vexar user interface v2

USER INTERFACE

Designing an intuitive interface for seamless interaction and usability

DIGITAL PLATFORM & TECHNOLOGY

PROJECT MANAGEMENT METHODOLOGY

We adopted the Agile Scrum methodology to effectively manage the project and ensure the timely delivery of high-quality results. Agile Scrum provides a flexible and adaptive approach to project management, allowing us to respond quickly to changing requirements and priorities.

PROJECT MANAGEMENT METHODOLOGY

PROJECT TIMELINE

VEXAR PROJECT TIMELINE

WHAT OUR CLIENT SAID

Our experience working with Computools was exceptional. Their team demonstrated deep expertise in healthcare hardware development and provided innovative solutions that exceeded our expectations. The collaboration was seamless, and we are delighted with the results.

CONTACT US TO GET A COST-EFFECTIVE
PROJECT ESTIMATE

Thank you for your message!

Your request will be carefully researched by our experts. We will get in touch with you within one business day.

WHAT HAPPENS NEXT?

01.
We deeply analyse your request.
02.
We create project roadmap, accelerating your time-to-value.
03.
We co-scope features, minimizing project risk upfront.
04.
We submit a comprehensive project proposal.
Trusted by: